3D Model of WTE Plant

Home»Development»3D Model of WTE Plant

This is 3D model of waste to energy plant based on pyrolysis technology. Bunker, sorting equipment, transportation lines, pyrolysis machines and generators are shown. Office for management and control room is also present.

Plant capacity is designed as 130,000 ton of municipal solid waste (MSW) per year. Power output is calculated on the 10MW level. 14 gensets 750 kW each are installed. All the dimensions in the model are real and implemented basing on the design project.

For more information on the technology, please visit ENCORE: Advanced Pyrolysis Technology page.