Landfill Sosenki for municipal solid and industrial waste
- Rehabilitation of the landfill by European standards
- Closed after 30 years of operation
- Area 34 hectares
- Geo-synthetic solutions by Naue
- 2 geo-synthetic layers: to drain methane and clay liner to cover from precipitation
- 5 layers total, including sand and soil
- Grass over covered landfill body
- Drainage system