Waste to Energy InternationalWTEI Call us: +372 712 0554 Email: [email protected]

Waste-to-Energy Model

Home»Development»Financial Model»Waste-to-Energy Model

Here we represent our online service for evaluation of financial feasibility of a waste-to-energy power plant. Basing on key technical and financial parameters, model calculates IRR (internal rate of return), payback period, net cashflow, NPV, and provides a number of details on cahflow, balance, and other pages.

Some data are entered in the form fields by default; you can use them or edit as needed. By click on Send button form will be submitted to our calculation server and in 10-30 seconds a .pdf file will be shown on this page (or downloaded by your browser). Results of calculations for free are “noised” with some arbitrary coefficients. If you send several times a form with the same values, you will have a number of different results in .pdf files returned.

To get exact calculations, please select “Yes, I need exact results” in “Bill me” field. Shortly you will receive a bill on EUR 599. Upon receipt of the payment, we will send you by email another .pdf file with exact results.

This model supports online calculations for MSW (municipal solid waste) only so far. You can order calculations for almost any type of waste, technology (incineration or pyrolysis), for production of electricity or synthetic fuel. Please fill out the form Project Questionnaire: Waste-to-Energy.

We also have services for wind and solar power projects financial calculations, as well as full-featured “what if” calculation scenarios. Please refer to our Financial Model page.

WTE Model Input Form

Questionnaire-Header

Client Information

First Name
Last Name
E-mail

Financial Data

Equity, %
Annual Interest Rate, %
Term of Credit, years
Grace Period, years
Method of Credit Amortization
Required Min DSCR
Inflation Rate for Base Tariff, %
Inflation Rate for Costs, %
Term of Project, years
Start of Operation, year
Bill Me

Technical Data

Project Name
Project Country
Project Country
Waste Type
Amount, tpy
Combustible Input, %
Moisture, %
Electricity Production, MW
Heat Production, MW
Operating Days per Year
Heat Production Days per Year
Term of Preferential Tariff, years
Preferential Tariff for Electricity
Preferential Tariff for Heat, EUR/MWh
Base Tariff for Electricity, EUR/MWh
Base Tariff for Heat, EUR/MWh
Tipping Fee, EUR/ton
Price for Metals, EUR/ton
Metals Production, ton/year
CAPEX per 1 ton of annual capacity, EUR
Land Lease, EUR 1000 per year
Insurance, EUR 1000 per year
Operations & Maintenance, EUR 1000 per year
Guarantee, EUR 1000 per year
Other Costs, EUR 1000 per year
Depreciation Period, years
Corporate Tax Rate, %