Coal to Synfuel – Brisbane
- Technology – ENCORE advanced pyrolysis technology
- Development – New Hope Group
- The area used – 0.4 ha
- 2 modules
- Start-up year – 2012
Details
| Capacity, ton per year | 16,000 |
| Synfuel production, litres per year | 4,128,000 |
| Location | Brisbane, Australia |
| Status | In operation |
Project Gallery – Coal to Synfuel – Brisbane

Proven Expertise in alternative energy Development and Construction
Work With Us
We know how to get energy from the sun, air and waste. Let’s build a better future for everyone, together!
Our Advanced Pyrolysis Plants
Coal to Electricity – Rosamond
Coal to Electricity Advanced Pyrolysis Plant. Turns 8,000 ton of coal (per year) into 2 MW of electricity.
Tires to Synfuel – Seoul
Location – Seoul, South Korea. Capacity – 1,000 ton per year of used tires. Synfuel production – 600,000 litres/year.
MSW to Electricity – Knoxville
Municipal solid waste to electricity. This advanced pyrolysis plant turns 8,000 tons of waste (per year) into 1 MW of electricity.



