Landfill Khmet’evo – construction and partial rehabilitation

  • Construction and partial rehabilitation of the landfill by European standards
  • Municipal solid waste
  • Geo-synthetic solutions by Naue
  • 2 geo-synthetic layers: to drain methane and clay liner to cover from precipitation
  • Geo-grid on scarps
  • 5 layers total, including sand and soil
  • Grass over covered landfill body
  • Drainage system

Details

Area55 hectares
Height50 meters
LocationMoscow region, Russia
StatusIn operation, partially rehabilitated

Proven Expertise in alternative energy Development and Construction

Work With Us

We know how to get energy from the sun, air and waste. Let’s build a better future for everyone, together!

Our Landfill Rehabilitation projects

Landfill Iksha - ditch construction

Landfill Iksha

Landfill Iksha for municipal solid and bulky waste. Construction and partial rehabilitation of the landfill by European standards.
Sand layer on liner

Landfill Salar’evo

Landfill Salar’evo for municipal solid and industrial waste. Rehabilitated after 25 years of operation.
Tipper with sand

Landfill Sosenki

Rehabilitation of the landfill (solid and industrial waste) by European standards. Closed after 30 years of operation.