Waste-to-Energy Financial Model

WTEI ➝ Services ➝ Online Services ➝ Waste-to-Energy Financial Model

Screen your waste-to-energy project in minutes

Use the WTE financial model to assess the financial feasibility of a municipal solid waste project. Enter your technical and financial assumptions and receive a PDF calculation with the report depth that fits your current stage.

  • Results in about 10–30 seconds
  • Free, Basic and Pro report options
  • No spreadsheet setup required

Designed for early-stage screening. The online model currently supports municipal solid waste (MSW) projects. For other waste types, technologies or tailored scenarios, use our custom project questionnaire below.

Not another Excel template

Financial model templates give you a spreadsheet. WTEI gives you a project result.

Downloadable Excel templates can be useful if you want to build and maintain the model yourself. They still require you to understand the workbook, calibrate assumptions, configure financing, check formulas and interpret the output.

With WTEI, enter your project assumptions online and receive a consistent Waste-to-Energy financial report in about 10–30 seconds.

No spreadsheet setup. No formulas to audit. No model adaptation.

Project-specific inputs

Use your actual waste volume, tariffs, tipping fee, CAPEX and financing assumptions.

Instant calculation

Receive the result automatically instead of configuring a financial workbook.

WtE-specific output

IRR, NPV, payback, DSCR, cash flow, P&L, balance sheet and debt metrics according to the selected report level.

A path beyond the model

If the project looks promising, WTEI can continue with expert review, project-specific modelling and feasibility work.

Report Types

Choose a quick free check, an exact management snapshot or the complete model output. You can change the selected report again in the form.

Free Demo

$0Instant PDF

A limited PDF snapshot for a fast first look at your project.

  • Core technical and financial inputs
  • Indicative model output
  • WTEI default advanced assumptions

Basic Snapshot

$290One-time payment

An exact executive snapshot for one base-case scenario.

  • Exact top-level financial indicators
  • More editable project assumptions
  • Concise PDF for internal review

Pro Full Report

$590One-time payment

The complete PDF output with all available assumptions editable.

  • IRR, NPV, payback and DSCR
  • Cash Flow, P&L and Balance Sheet
  • Debt schedule and financial ratios

Online screening, not just a workbook

Choose between setting up a generic template yourself and receiving a project-specific result from an automated WtE screening service.

Downloadable Excel templateWTEI Online Screening
Buy the workbookEnter project assumptions
Learn the model structureNo spreadsheet setup
Calibrate it yourselfWTEI defaults where appropriate
Adapt financing and tax logic yourselfSelect inputs through the web form
Troubleshoot formulas and settingsCalculation handled automatically
Interpret workbook outputsReceive a finished PDF
Tool ends with the spreadsheetContinue to expert review or feasibility work

How it works

  1. Choose a report.
    Select Free, Basic or Pro above or in the form.
  2. Enter project data.
    Use the defaults or replace them with your assumptions.
  3. Receive your PDF.
    Free results open directly; paid reports continue through secure checkout.

Start your WTE screening

Complete the visible fields below. The form automatically shows the assumptions available for the selected report type.

Questionnaire-Header

Client Information

Financial Data

Technical Data

Need a custom WTE financial model?

For non-MSW feedstocks, incineration or pyrolysis configurations, synthetic fuel production, project-specific financing structures or multiple what-if scenarios, request a tailored calculation.

Frequently Asked Questions

What is included in the Free Demo?

The Free Demo provides a limited PDF snapshot using WTEI defaults for advanced assumptions. It is intended for an initial screening and does not include the exact full financial statements, DSCR schedule or debt schedule.

What is the difference between Basic and Pro?

Basic provides exact top-level financial indicators for one base-case scenario in a concise PDF. Pro unlocks every available input and the full report, including IRR, NPV, DSCR, Cash Flow, P&L, Balance Sheet, debt schedule and ratios.

How quickly will I receive the result?

After you submit valid inputs, calculation usually takes about 10–30 seconds. Free results open directly. Basic and Pro reports continue through secure Stripe Checkout before access to the paid result.

Can I change the default values?

Yes. The form starts with practical default values, and you can replace every field visible in your selected report mode. Hidden assumptions are calculated or filled with WTEI defaults.

Can the online model calculate projects using waste other than MSW?

The online version currently supports municipal solid waste only. For other feedstocks, technologies or outputs, send the WTE project questionnaire so WTEI can prepare a tailored calculation.

Is this report a bankable feasibility study or investment advice?

No. The online report is a screening tool based on the data you enter. It does not replace technical due diligence, a bankable feasibility study, legal or tax advice, or an investment decision process.